Download Print this page

Bayer HealthCare RH800 Installation Manual page 28

Advertisement

Step 3.
Connect the 1/2" Plastic Shutoff Valve to the piece of 1/2" Tubing.
Step 4:
Remove the 1/2" Calibration Port Plug from the top of the Tank.
• Cut to fit a piece of 1/2" Tubing.
• Press it into the 1/2" Plastic Shutoff Valve.
• Press the other end into the 1/2" 90° Elbow Press-lock Fitting and install on top of the CBP Tank as shown.
Continued 
28

Advertisement

loading

This manual is also suitable for:

Rh2000