Download Print this page

Bayer HealthCare RH800 Installation Manual page 26

Advertisement

Note: refer to the INOCULATION TANK USER
MANUAL shipped with the inoculation tank for
complete installation and operation instructions.
Inoculation Tank Power Cord
Repeat the Flow Meter and Top Mount Calibration assembly steps on pages 13-16.
Connect the Pump Power Cord (4-prong) under the RH Control receptacle - marked PUMP #1-4. If already using
four chemical Tanks, then connect the Inoculant Tank cord to an external power source.
This completes the CBP Tank Installation.
26
CONNECT

Advertisement

loading

This manual is also suitable for:

Rh2000