Extreme Networks ExtremeSwitching Virtual Services Platform 8000 Series Installation Manual page 65

Table of Contents

Advertisement

Important notice about rack safety
One prerequisite to installing the switch in an equipment rack is to bolt the equipment rack to the
floor. This section emphasizes the safety issue if you do not bolt the rack to the floor.
Warning:
If you pull the chassis all the way out on the slide rails, there is a danger of the rack tipping over
if the rack is not bolted to the floor. This can happen even if there are other devices installed in
your equipment rack.
To avoid this danger, refer to the guidelines in the graph below the figure.
If your rack meets the following guidelines and you pull the chassis all the way out, the rack is in
danger of tipping over:
• 900mm equipment rack that weighs less than 14kg
• 600mm equipment rack that weighs less than 21kg
• 300mm equipment rack that weighs less than 42kg
March 2020
Installing the VSP 8000 Series in an Equipment Rack
Installing the VSP 8000 Series
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents