Extreme Networks ExtremeSwitching Virtual Services Platform 8000 Series Installation Manual page 46

Table of Contents

Advertisement

Installing the Virtual Services Platform 8000 Series
c. Slide the white release latch in the direction of the arrow stamped on the lock and pull
the chassis rail out of the rack rail.
4. Lift the blue locking mechanism on the rack rail to slide the outer section back into the main
section.
March 2020
Installing the VSP 8000 Series
46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents