Attach The Rail Slide Rail Brackets To The Equipment Rack - Intel OCPRF100 MP Quick Start Manual

Server system
Table of Contents

Advertisement

Attach the Rail Slide Rail Brackets to the Equipment Rack

NOTE
Mounting holes in the vertical rails of equipment racks are commonly
spaced in a 5/8 x 5/8 x 1/2-inch sequence. Perform the following steps
carefully; brackets must be mounted with precision to allow room for the
next server you install in a rack.
See Figure 6.
1. Remove a right-angle extension bracket, two screws, and a bar nut from the kit.
2. While facing the front or back of the rack, orient the right-angle extension bracket so that the
short side with the four mounting holes is facing toward the outside edge of the vertical rail.
3. Position the bracket behind the mounting holes in the vertical rail.
4. With a pencil, mark the top and bottom hole locations of the bracket on both sides of the
vertical rail; no hole numbers are printed on the rail.
5. Insert a screw through the marked top hole in the rail and through the top hole in the bracket.
Place a bar nut on the screw and loosely tighten it. Repeat for the marked bottom hole.
6. Install the three remaining right-angle extension brackets on the other three vertical rails by
repeating steps 1–5 above.
10 Quick Start Guide
2
1
3
Figure 6. Right-angle Bracket and Vertical Rail
A.
Screw
B.
Vertical rail
C. Bar nut
D. Right-angle extension bracket
4
OM05955

Advertisement

Table of Contents
loading

Table of Contents