Sega Giant Plants vs Zombies The Last Stand Manual page 6

Table of Contents

Advertisement

Procedures not described in this manual or marked as 'to be carried out by site
out by personnel without the necessary skill or technology. Work carried out by
Parts replacement, maintenance inspections and troubleshooting should be carried out by site maintenance personnel
only be carried out by professionals with the appropriate specialised knowledge.
Site maintenance personnel:
Individuals with experience in maintaining amusement equipment, vending machines, etc., working under the super-
vision of the owner/operator of this product to maintain machines within amusement facilities or similar premises by
carrying out everyday procedures such as assembly, maintenance inspections, and replacement of units/expendable
parts.
Activities to be carried out by site maintenance personnel:
Amusement equipment/vending machine assembly, maintenance inspection and replacement of units/expendable
parts.
Persons employed by amusement equipment manufacturers, or involved in design, production, testing or mainte-
nance of amusement equipment. The individual should have either graduated from technical school or hold similar
Amusement equipment/vending machine assembly, repair/adjustment of electrical/electronic/mechanical parts.
iv

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents