SI-912 i-024
SI-915 i-006
3) Accomplishment/Instructions
-
ROTAX
become necessary due to this standardization, at the time of next revision or issue.
NOTE:
Accomplish-
All measures must be implemented and confirmed by at least one of the following persons or
ment
organizations:
-
ROTAX
-
Persons with approved qualifications for the corresponding engine types. Only authorized per-
sons (iRMT, Level Heavy Maintenance) are entitled to carry out this work
NOTE:
NOTE:
3.1) Installation - related information
3.2) Maintenance (Line) - related information
Visual inspection of the wiring harness,
connectors and brackets for secure fit,
damage and signs of wear.
3.3) Maintenance (Heavy) - related
For the modification of old style connector the following assembly steps do apply:
03 July 2019
Initial Issue
Copyright - BRP-Rotax GmbH & Co KG. All rights reserved.
reserves the right to make any amendments to existing documents, which might
®
Before maintenance, review the entire documentation to make sure you have a com-
plete understanding of the procedure and requirements.
- Authorized Distributors or their independent Service Centers
®
All work has to be performed in accordance with the relevant Maintenance Manual.
Indicates supplementary information which may be needed to fully complete or under-
stand an instruction.
Pay attention to the specifications of the latest version of the Installation Manual (IM)
for the respective engine type.
See relevant Maintenance Manual (Line) for the respective engine type and its period-
ical maintenance information.
Points of inspection
Pay attention to the specifications of the latest version of the Maintenance Manual
Heavy (MMH) Chapter 76-10-00 section Fuse box installation for the respective engine
type.
SERVICE INSTRUCTION
Interval
Operating hours
100 h
200 h
x
Chapter
reference
12-20-00 section 15.1
76-10-00
Page 5 of 18
Need help?
Do you have a question about the 912 i Series and is the answer not in the manual?
Questions and answers