Wiring Diagram; Maintenance - Salda AKU Series Mounting And Installation Instruction

Table of Contents

Advertisement

WIRING DIAGRAM

PE
BU
yellow – green
blue
PE
yellow – green
PE
U
1
yellow – green
brown
START-UP
Operation start-up of the unit shall be performed only by trained and qualified personnel.
Before start-up, make sure that power supply circuit corresponds to the specification indicated in the label.
Before start-up, make sure that the unit is connected to the mains in accordance with the wiring diagram shown in this document and under the
cover of power supply connection box.
Before start-up of the fan, make sure that the above instructions of safety and installation are applied.
Upon start-up of the unit, make sure that the motor rotates evenly, without vibration and outside noise.
Upon start-up of the unit, make sure that the air flow generated by the unit matches the direction(s) of air indicated on the casing.
The current of the motor shall be tested for compliance with the maximum allowed current (indicated in manufacturer label).
Check of the motor overheat is obligatory.
Too frequent turn on or turn-off of the fan is not allowed to avoid overheat of the motor windings or damage of the insulation.

MAINTENANCE

Bearings of the fan are maintenance-free.
AKU_AKU EKO v2019.04
#1
BN
BK
brown
black
#4
U
2
blue
#6
U
2
blue
#2
YE
yellow
#5
TB (#4)/ Z(#5)
brown
#7
Z
Z
1
2
black
orange
#3
WH
RD
white
red
Z
2
black
TK
white
EN |
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents