Sequence Of Operation; States Of Operation For The Xpr Cutting System; Powerup State (1) - Hypertherm XPR300 Instruction Manual

Table of Contents

Advertisement

Sequence of operation

The flowcharts on the following pages show the sequence of operation for the XPR cutting system.

States of operation for the XPR cutting system

Each state of operation is assigned a unique name and number for identification purposes. The type
of name you see (name or number) depends on your cutting system settings.

Powerup State (1)

The operator supplies power to the cutting system to start the Powerup State (1).
Power is supplied to the cutting system.
Cutting system operation STARTS.
Make sure that signals are OFF for the following:
• Main contactor
• Coolant pump
• Cooling fans
Establish CAN communication.
Wait for RS-422 serial, EtherCAT, or wireless
communication between the plasma power supply
and CNC or wireless device.
Determine system configuration (number of
choppers and number and type of consoles).
Is Powerup State (1) complete and successful?
Yes
Continue to
Initial checks State (2)
XPR300
Instruction Manual
No
on page 208
809480
Diagnose and troubleshoot the problem. Refer to
Diagnostics and Troubleshooting
Then, start the Powerup State (1) again.
6
Operation
on page 259.
207

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xpr170Maxpr0200

Table of Contents