Sequence Of Operation; States Of Operation For The Xpr Cutting System; Powerup State (1) - Hypertherm XPR300 Instruction Manual

Plasma
Table of Contents

Advertisement

Sequence of operation

The flowcharts on the following pages show the sequence of operation for the XPR cutting system.

States of operation for the XPR cutting system

Each state of operation has a unique number (for example, 1 for the Powerup State). The numbers
are in ascending order. However, they are not sequential. Some numbers are not in the sequence.

Powerup State (1)

The operator supplies power to the cutting system to start the Powerup State (1).
Power is supplied to the cutting system.
Cutting system operation STARTS.
Make sure that signals are OFF for the following:
• Main contactor
• Coolant pump
• Cooling fans
Establish CAN communication.
Wait for RS-422 serial, EtherCAT, or wireless
communication between the plasma power supply
and CNC or wireless device.
Is Powerup State (1) complete and successful?
Yes
Continue to Initial checks State (2) on page 198
XPR300
Instruction Manual
No
809480
Diagnose and troubleshoot the problem. (See
Diagnostics and Troubleshooting on page 251.)
Then, start the Powerup State (1) again.
6
Operation
197

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents