Assembling The Base (Optional) - Vatech PaX-Primo Installation Manual

Hide thumbs Also See for PaX-Primo:
Table of Contents

Advertisement

3.2.

Assembling the base (optional)

Please make sure that ground on which equipment is to be installed is flat and
dry before installation.
1. Unpack the carton and locate two units ━ main unit and base plate.
<PaX-Primo main unit>
2. Unpack the carton and locate two units - main unit and base plate.
<base plate>
37
Installation manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents