Maintenance Work; Wear Parts Exchange - Beko BEKOMAT 13 Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual

10.3 Maintenance work

For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Tools
Screwdrivers:
Cross-head size 2.5 mm (0.09")
Flat-blade size 2.5 mm (0.09")
e.g. adjustable spanner
Cleaning brush made of wire or soft
plastic material with
Ø max. = 1,5 mm (0.05")
Ø max. = 2,5 mm (0.09")
1.
Decommissioning and disassembly must have been completed.

10.3.1 Wear parts exchange

Illustration
BEKOMAT
Prerequisites
Material
Sealants
Lubricant for greasing the O-rings
Mild detergent
Cotton cloth or disposable tissue
Preparatory tasks
Description / explanation
3
2. Loosen the 4 pan-head screws [3].
13, 13 CO, 13 CO PN25, 13 CO PN40
®
Protective equipment
Always to be worn:
37 | 64

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents