Original installation and operation manual
10.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Tools
•
Screwdrivers:
Cross-head size 2.5 mm (0.09")
Flat-blade size 2.5 mm (0.09")
•
e.g. adjustable spanner
•
Cleaning brush made of wire or soft
plastic material with
Ø max. = 1,5 mm (0.05")
Ø max. = 2,5 mm (0.09")
1.
Decommissioning and disassembly must have been completed.
10.3.1 Wear parts exchange
Illustration
BEKOMAT
Prerequisites
Material
•
Sealants
•
Lubricant for greasing the O-rings
•
Mild detergent
•
Cotton cloth or disposable tissue
Preparatory tasks
Description / explanation
3
2. Loosen the 4 pan-head screws [3].
13, 13 CO, 13 CO PN25, 13 CO PN40
®
Protective equipment
Always to be worn:
37 | 64