Safety Instructions For Maintenance Work - Beko DRYPOINT AC Series Installation And Operating Manual

Cold-regenerated adsorption dryer with dew point control
Table of Contents

Advertisement

Installation and operating manual

1.3.4. Safety instructions for maintenance work

All persons involved in the installation, start-up, operation or maintenance of the plant must have read and fully
understood the installation and operating instructions, and in particular the safety instructions. If you have any
queries, please contact the manufacturer.
The manufacturer shall not be liable for damage caused by incorrect installation, assembly or start-up of the plant.
The plant operator shall be solely responsible for such damage.
The responsibilities for maintenance work must be clearly assigned. Before carrying out any maintenance work,
inform the operating personnel.
All prescribed configuration, maintenance and inspection tasks must be carried out by customer service technicians 
of the manufacturer and according to the schedule.
Strictly adhere to all instructions regarding the maintenance of the plant.
DANGER
Maintenance work during plant operation
Carrying out maintenance work while the plant is in operation poses an increased risk to
persons.
DANGER
Improper replacement of components
Incorrect replacement of components can cause serious or even fatal injury.
DANGER
Assembly work above head height
Assembly work above head height can cause serious or even fatal injury.
NOTE
Use of unsuitable or damaged components
The use of unsuitable or damaged components can cause malfunction of the plant.
10
For certain maintenance tasks, the plant must be completely shut down, de-energized
and depressurised.
Shut down the plant, following the relevant instructions.
Depressurise the plant.
Disconnect it from the electric power supply, secure it against inadvertent switching on
and attach a warning sign
to the main switch.
If guards need to be removed, let the plant cool down before carrying out any further
work. Before restarting the plant, mount and secure the guards and insulation.
We strongly recommend having damaged or wearing parts replaced by a customer
service technician of the manufacturer.
After completion of the maintenance work, perform a leakage test.
To replace large assemblies, use lifting gear and secure the parts properly before moving
them! Use only lifting gear lashing equipment that is in proper working order and has the
necessary load capacity!
For all such work, use safety-approved ladders and work platforms!
Never use machine parts as climbing aids! Risk of injury from fall!
For all maintenance work above a height of 1.80 m, wear fall arrest equipment!
If you detect any serious damage to the pressure devices, shut them down and remove
them immediately!
Replace damaged components with new ones.
Replace wearing parts according to the prescribed schedule in the devices and spare
parts list or in chapter "7.2. Maintenance schedule". This list is an integral part of these
installation and operating instructions.
Use only original spare and accessory parts supplied by the manufacturer. Third-party
components might not meet the necessary stress and safety standards.
DRYPOINT
AC 410 – 495 | DRYPOINT
®
EN
AC 410 – 495 MS
®

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents