Commissioning And Operation; Before Switching On; During Operation - Lenze L−force GST Operating Instructions Manual

Geared motors
Table of Contents

Advertisement

6

Commissioning and operation

(
Stop!
The drive may only be commissioned by skilled personnel!
6.1

Before switching on

Check:
Does the drive appear undamaged?
ƒ
Is the mechanical fixing o.k.?
ƒ
Has the electrical connection been carried out properly?
ƒ
Are all rotating parts and surfaces that may become hot protected against contact?
ƒ
If the oil level of the drive has been increased due to storage purposes (see
ƒ
chapter 4.2), it must be reduced again to the height permissible for the intended
mounting position.
For gearboxes with breathing:
ƒ
– Has the transport locking device been removed?
6.2

During operation

)
Note!
The helical−worm gearboxes reach their full performance only after a short
running−in period of 24...48 hours at rated torque!
During operation, check the drive periodically and take special care of:
Deviations from normal operation such as
ƒ
– abnormal noises, stronger vibrations, or increased temperatures
– leakages,
– loose fixing elements,
– the condition of the electrical cables.
If any interference should occur, you have to stop the drive and go through the steps
ƒ
for troubleshooting and fault elimination (chapter 8). If the interference cannot be
eliminated, please contact the Lenze Service.
BA 12.0023−EN
6.0
Commissioning and operation
Before switching on
l
6
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents