Configuration Steps - LG niagara4 MultiSITE Edge 10 User Manual

Table of Contents

Advertisement

Figure 34: Job Step Failure Example with Log Message Details

Configuration steps

Provisioning is a flexible tool, designed for both setting up new devices, and maintaining existing devices. Due to the number of
possible network and device configurations, it is not possible to provide a list of steps for every scenario. However, for initial
setup of an out-of-the-box device, the following list of steps is provided as a recommended starting point to setup the device,
update the software, and establish the initial communications. Running a provisioning job containing these steps will setup the
device in a similar way to commissioning.
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
MS- E10 User Guide
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pbase10

Table of Contents