Starting The Commissioning Wizard - LG niagara4 MultiSITE Edge 10 User Manual

Table of Contents

Advertisement

Before starting the commissioning process, note the following points:
Throughout the wizard's dialogs, use the buttons Back and Next, as needed, to retrace (or skip) steps. Also, the
Cancel button exits the wizard after your confirmation—no operations are performed as a result.
Before committing to the final sequence of steps, the wizard provides a summary for you to review.

Starting the Commissioning Wizard

The Commissioning Wizard runs a series of steps to guide you through all the needed information.
Prerequisites:
In Workbench on your PC, open a platform connection to the MS-E10 device.
Step 1: In the Nav tree, right-click Platform →Commissioning Wizard.
The dialog box Commissioning for "<IP address>" displays with default selections for a new MS-E10 device).
Figure 9: Commissioning dialog box
By default, all steps are preselected except lexicon installation. Steps are executed in the order listed.
Note:
In Niagara 4.6 and later, if the Workbench FIPS Option to Show FIPS Options is set to "true" certain FIPS options become visible
in this window. If selected, FIPS-strength password requirements are enforced.
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
MS- E10 User Guide
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pbase10

Table of Contents