Elite Screens Sable Frame B2 Series User Manual

Elite Screens Sable Frame B2 Series User Manual

Matte white fixed frame screen

Advertisement

__________________________________________________________________________________________
Congratulations on your new Sable Frame B2 purchase! The material included is our ISF Certified CineWhite®
UHD 2 which produces accurate colors in a light controlled environment which reproduces the content as the
director intended.
In order for the CineWhite® UHD 2 to maintain its projection qualities and optimum performance please refer to
the list below for proper maintenance and cleaning.
Use a dry microfiber cloth to remove dust from the screen's surface.
When cleaning, use a damp microfiber cloth with warm water to remove any marks.
Never rub or apply pressure when cleaning the surface.
Never attempt to use any solutions, chemicals, or abrasive cleaners on the screen surface.
In order to avoid damaging the screen, avoid touching it directly with your fingers, pens/pencils or any
other sharp or abrasive objects.
11092020JA
Matte White Fixed Frame Screen
www.elitescreens.com
Sable Frame B2 Series
Featuring CineWhite® UHD
USER'S GUIDE – M Type
U-00199
2
2
V
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Sable Frame B2 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Elite Screens Sable Frame B2 Series

  • Page 1 Sable Frame B2 Series Matte White Fixed Frame Screen Featuring CineWhite® UHD USER’S GUIDE – M Type __________________________________________________________________________________________ Congratulations on your new Sable Frame B2 purchase! The material included is our ISF Certified CineWhite® UHD 2 which produces accurate colors in a light controlled environment which reproduces the content as the director intended.
  • Page 2 Frame Parts List A. Vertical Frame x 2pcs B. ½ Horizontal Frame x2 pcs C. ½ Horizontal Frame x 2 pcs Hardware Parts List M4*4 D5*4 M4*4 D5*4 Black 100” 110” 120” 135” 150” Item Parts List Center Joints- M4 (bottom position) Center Joints-D5 (top position) Elbow Joints M4 (bottom position) Elbow Joints D5 (top position)
  • Page 3 Frame Assembly Step 1: Place the EPE sponge (foam) sheet on the ground of the area where screen will assembled. Step 2: Position the pieces of the frame on the EPE sponge in the arrangement shown below. Step 3: Insert center joint (a/b) connectors into one-half of the horizontal frame (B/C) and secure with the M4x7 screws (g) as shown in the illustration below.
  • Page 4 Screen Material Step 6: Put on the white gloves (p) and carefully unroll the screen material on a clean surface from the roller to the other side as shown below. The back side of the screen material should be placed upwards. Front Then place a bottom grommet (r) on the screen material’s eyelet and snap in the top...
  • Page 5 How to attach the springs Step 9: Hook one end of the spring and secure inside the groove of the frame, use the spring hook (i)to attach the spring to the hole located on the screen material’s outer edge in the following order. Spring must hook both overlapping short rods.
  • Page 6 If not installing into a structural wood stud, mark the sites where the hollow wall anchors will be placed using the same instructions above. With the wood anchor installed, repeat the process and fasten the brackets with the M5x50 wood screws. For Technical Support or an Elite Screens contact in your area, visit www.elitescreens.com 11092020JA www.elitescreens.com...

This manual is also suitable for:

Sable frame 2 series

Table of Contents