10 OPERATOR INSTALLATION
-
1 - Check the fixing point most suitable for the front bracket of the operator [5] and mark it.
2 - Indicate the point on the pillar with a spirit level to fix the rear bracket [5].
3 - Find the fixing point of the rear bracket in function of quotas A-B [4].
WARNING: if the pillars or walls are big, you must make a niche [7], so that quotas A, B, E are met.
4 - Fix the rear bracket:
• Weld (if it is an iron pillar), previously checking the column thickness. If it is less than 5mm, provide a
reinforcing plate of such size that it allows making the welds on the edge of the column.
• If it is a concrete pillar, you must make a plate 5 mm of thickness with no. 4 holes. Weld the bracket in the
middle of the plate and fix it with some screws.
5 - Power the operator [9], bring the rod completely forward, then make it go back for 5-10 mm.
6 - Fix the front bracket on the operator [8].
7 - ring the leaf in closing position against the mechanical stops and fix it with a clamp.
8 - Mount the operator on the rear bracket with the pin provided [8].
9 - Put the front bracket in the point previously marked at point 1, check the levelling of the operator with a spirit level
and mark the exact fixing point of the front bracket [5-6].
10 - Remove the operator from the rear bracket.
11 - Remove the front bracket of the operator.
12 - Fix the front bracket in the point marked.
Fixing the front bracket:
• Weld (if it is an iron gate), previously checking the tubular thickness, where we are going to weld
the bracket. If it is less than 5mm, provide a reinforcing plate of such size that it allows making the welds
on the edge of the tubolar.
• If the gate is made with a material different from iron, you must make a plate 5 mm of thickness with no. 4 holes.
Weld the bracket in the middle of the plate and fix it with some through screws.
13 - Assemble the operator on the brackets [8].
14 - Screw the tension rods
15 - Lightly lubricate the seal
16 - Fix all with the two screws provided à [10].
WARNING:
• Make the welding operations with the operator not assembled on the brackets.
• In case of heavy and/or buffered gates, it is necessary to strenghten both brackets with reinforcing hard metal
plates (not provided ).
• Before definitively fixing the brackets, make some manual tests of gate opening and closing, to check the
installation quotas.
À
[10]
for 4-5 mm on the operator head.
Ä
[10], insert the carter
Á
and the head Â
[10]
TOP EVO
[10].