Power Modules
4.5 Installation
NOTICE
Damage to the device due to improper transport
Improper transport can cause mechanical loads on the housing or busbars which can result
in damage to the device.
• Use a lifting harness with vertical ropes or chains during transport.
• Do not use the busbars as handles or for fastening a lifting harness.
• Only tighten the crane lifting lugs by hand. Remove the crane lifting lugs after the
Screw coupling points for mechanical support
The Power Modules are provided with screw coupling points at the top and bottom so that
they can be connected to modules mounted adjacently.
Protection guard
A protection guard is mounted on the bottom of the Power Module ("1" in the diagram below)
for use during transportation. The Power Module can be placed down on this protection
guard while it is removed from the packaging and during transportation.
Before the module is installed at its final location, this guard must be removed. To do this,
remove the four screws ("2" in the diagram) and remove the guard.
Risk of injury due to toppling when placing down on the protection guard
A module placed down on the protection guard can topple over therefore causing injury.
• When the module is placed down on the production guard, ensure that it cannot topple
124
installation, but keep them for later use.
CAUTION
over.