Putting the filter housing into operation
The filter housing is delivered without installed filter elements. Prior to
commissioning, insert all filter elements into the filter housing.
Proceed as described on page 27 in the chapter "Replacing the filter
elements".
Before commissioning, fill and bleed the passive filter housing completely.
Performing maintenance
The MRF is optionally supplied with an electric pressure gauge. This
indicates when the filter element change is required.
The MRF can be optionally equipped with an electric back-pressure indicator.
Once the contamination retention capacity of the filter elements has been
reached, replace the filter elements acc. capter "Replacing the filter
elements" on page 27.
MRF4
MoWa MRF4 3214670d en-us 2018-02-09.docx
Putting the filter housing into operation
WARNING
Hydraulic systems are under pressure
Danger of bodily injury
The hydraulic system must be depressurized
►
before performing any work on the hydraulic
system.
en(us)
Page 26 / 36
2018-02-09
Need help?
Do you have a question about the MRF4 and is the answer not in the manual?