Intenza+" Water Filter Installation - Gaggia Milano NAVIGLIO MILK User Manual

Hide thumbs Also See for NAVIGLIO MILK:
Table of Contents

Advertisement

Available languages

Available languages

MAN. GAG. NAVIGLIO MILK USA EN.indd 15
5
Place a container under the steam wand.
6
Press the "
" button for 5 seconds to start dispensing hot water.
7
Dispense water until the no water LED light "
8
At the end of this operation, fill the water tank again up to the MAX level. The
machine is now ready for use.
Note: When you have not used the machine for two or more weeks, the machine
will automatically perform an automatic rinse cycle after you turn it on. Following
this, you need to perform a manual rinse cycle as described above.
The automatic rinse cycle also starts automatically when the machine has been in
stand-by mode or turned off for more than 15 minutes.
At the end of the cycle, you can brew a coffee.

"INTENZA+" Water Filter Installation

We recommend installing the "INTENZA+" water filter as this prevents limescale
build-up and preserves a more intense aroma to your espresso.
Water is a crucial part of every espresso, so it is most important to always have
it professionally filtered. Using the "INTENZA+" water filter will prevent mineral
deposits from building up and improve your water quality.
1
Remove the small white filter from the water tank and store it in a dry place.
ENGLISH
" remains on.
05/11/2019 11:37:42
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ri8749

Table of Contents