Baxi POWER HT+ Series Installation And Service Manual page 47

Gas fired floor-standing condensing boiler
Hide thumbs Also See for POWER HT+ Series:
Table of Contents

Advertisement

Fig.50
Maximum length of the connections
L
1
3
L
L
L
5
6
L1
9
Arrangement
Configuration
L3<2m + 2 el­
(L1 + L2) rigid
bows
L3<2m + 2 el­
(L1 + L2) flexi­
bows
ble
L3<5m + 2 el­
(L1 + L2) rigid
bows
L3<5m + 2 el­
(L1 + L2) flexi­
bows
ble
Pressure available at blow back Pa
7609474 - v02 - 04092014
L
2
4
L
L
L
7
8
L2
Unit
POWER HT+
1.50
mm
Ø 80
m
20
m
15
m
m
200
Tab.17 Flue gas system connection type B23p
POWER HT+
1.70
Ø 110 Ø 80
Ø 110
56
8
56
56
6
38
56
56
56
38
200
Ventilation of the premises: In accordance with the standard NFP 45 –
204 or DTU 61.1
Lengths L1, L2 and L3 are obtained with Centrovec pipes covered by
CE marking and the TAD Technical Application Directive.
POWER HT+
POWER HT+ 1.110
1.90
Ø 110
Ø 125
Ø 110
20
56
56
21
15
24
56
13
200
200
6 Installation
Ø 125
Ø 160
56
43
56
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents