Fig.50
Maximum length of the connections
L
1
3
L
L
L
5
6
L1
9
Arrangement
Configuration
L3<2m + 2 el
(L1 + L2) rigid
bows
L3<2m + 2 el
(L1 + L2) flexi
bows
ble
L3<5m + 2 el
(L1 + L2) rigid
bows
L3<5m + 2 el
(L1 + L2) flexi
bows
ble
Pressure available at blow back Pa
7609474 - v02 - 04092014
L
2
4
L
L
L
7
8
L2
Unit
POWER HT+
1.50
mm
Ø 80
m
20
m
15
m
–
m
–
200
Tab.17 Flue gas system connection type B23p
POWER HT+
1.70
Ø 110 Ø 80
Ø 110
56
8
56
56
6
38
56
–
56
56
–
38
200
Ventilation of the premises: In accordance with the standard NFP 45 –
204 or DTU 61.1
Lengths L1, L2 and L3 are obtained with Centrovec pipes covered by
CE marking and the TAD Technical Application Directive.
POWER HT+
POWER HT+ 1.110
1.90
Ø 110
Ø 125
Ø 110
20
56
56
–
21
15
24
56
–
13
–
–
200
200
6 Installation
Ø 125
Ø 160
56
–
–
–
43
56
–
–
47