6
Installation
6 6 .1
General
6.2
Preparation
Fig.35
Removing the front panel
1
Fig.36
Tilting the panel holding the control
panel
2
7609474 - v02 - 04092014
Installation must be carried out in accordance with the prevailing regula
tions, codes of practice and the recommendations in this manual.
6.2.1 Accessing the internal boiler components
1. Remove the front panel by pulling firmly on the notches provided.
MW-3000022
2. Lift and tilt the panel holding the control panel
MW-3000023
6 Installation
37