Operation - turck IM12-FI01-1SF-1R Safety Manual

Frequency transducer
Table of Contents

Advertisement

Operation Instructions
6.4

Operation

If the device is used in low demand mode, proof tests shall be executed periodically accord-
ing to T1 (see
Ensure that the plug connections and cables are always in good condition.
The device must be replaced immediately if the terminals are faulty or the device has any vis-
ible faults.
If cleaning is required, do not use any liquid or statically charging cleaning agent. Perform
proof tests after each cleaning (see
The device must be replaced before remaining longer than 24 h within the safe state due to
an internal failure
The proof test (see
installation and parameterization in order to check the requested function.
The DIP switches shall not be modified during operation. The device shall be locked against
unintended operation/modification.
V
for safety applications
I max = 2 A
400
300
200
100
50
10
0,1
Fig. 6:
The connection of a deactivated input is unnecessary.
18
„Appendix: Proof Test" on page
„Appendix: Proof Test" on page
AC
resistive load
DC
resistive load
0,5 1
2
5
10
20
Output relay load curve
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | more@turck.com | www.turck.com
22).
„Appendix: Proof Test" on page
22) shall be executed each time after
A
22).

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IM12-FI01-1SF-1R and is the answer not in the manual?

Questions and answers

Table of Contents