Assignment of the physical address

The physical addresses and parameters are assigned and programmed in ETS.
The device features a Programming button for physical address assignment. The red Programming LED
lights up after the button has been pressed. It goes off as soon as ETS has assigned the physical address
or the Programming button is pressed again.
2.4.4

Download reaction

The device can be programmed in different ways: via one of the integrated tunneling servers or via another
programming interface (USB or IP).
Note
Any USB interface used for programming a KNX Secure device must support "long frames."
One suitable USB interface is the USB/S 1.2 from ABB.
There must be a connection to the KNX TP (twisted pair) in order to program the device.
After the download is complete, the device reboots and closes all open tunneling connections.
If the device's IP address was changed during the download, the tunneling connections must be
reconfigured manually in the tunneling clients. Tunneling clients establish the connection to the server via
the IP address.
The data programmed with ETS is adopted no later than 60 seconds after the download.
2.4.5

Unloading the device and resetting to factory settings

The device can be reset to the factory settings. This is a Secure device, so the following information must
be observed:
When the device is operated in KNX Secure mode, it can be reset via ETS only if ETS uses the project
with which the device was parametrized or if the commissioning key is available in the project.
The device can be unloaded by right-clicking it in ETS.
Option: unloading the application
The IP address and IP configuration will be retained
The passwords and IP addresses of the tunneling servers will be deleted
The tool key assigned by ETS will be retained. In other words, the FDSK will not be needed for
reprogramming
The physical address will be retained
Option: unloading the physical address and the application
The device will be reset to the factory state
The FDSK will be needed for re-commissioning unless it is still available in the ETS project from the
original commissioning process