Operating Controls; Display Elements - ABB i-bus KNX IPS/S 3.5.1 Product Manual

Ip interface secure
Table of Contents

Advertisement

ABB i-bus
®
KNX
Device technology
2.6

Operating controls

There are no operating controls located on the IP Interface Secure.
2.7

Display elements

Three indicator LEDs are located on the front of the IPS/S:
ON
ON
The LED lights for a few seconds after connection of the supply voltage.
After the supply voltage is connected, the LED initially lights up continuously.
After approx. 40 seconds, the LED starts flashing until the startup process is complete and
the LED lights up continuously again.
LAN/LINK
The LED lights up when the supply voltage is present and the Interface is connected to an
Ethernet network.
The LED flashes when the device detects activity on the network, e.g. when data is exchanged.
Telegram
The LED lights up when the Interface is connected to a TP network and the startup process is
complete (see "On" LED).
The LED flashes when the device detects activity on the KNX subline TP1 (twisted pair 1),
e.g. when data is exchanged.
18 9AKK107680A8655 EN Rev. A | IPS/S 3.5.1
LAN/LINK
Telegram

Advertisement

Table of Contents
loading

Table of Contents