MTU Detroit Diesel 12 V 2000 P62 Technical Publication page 108

Table of Contents

Advertisement

104
8. Install injection pump, observing marked
installation position.
9. Install securing screws of injection pump
and tighten with torque wrench to specified
torque 60 Nm + 12 Nm.
10. Install fuel line (2).
11. Use torque wrench to tighten union nut at injection
pump to specified torque 20 Nm + 5 Nm.
• Maximum permissible tightening torque: 35 Nm
12. Use torque wrench to tighten union nut on pressure
pipe neck to specified torque 20 Nm + 5 Nm.
• Maximum permissible tightening torque: 35 Nm
13. Install injection pump wiring (1).
14. Tighten screws to specified torque
1.0 Nm ± 0.2 Nm using torque wrench.
Final steps
1. Remove barring tool (→ Page 89).
2. Clean mating faces on cylinder head and charge-air pipe.
3. Check gaskets for damage and replace them, if required.
4. Coat gaskets with petroleum jelly and place onto cylinder head.
5. Install charge-air pipes.
6. Install engine control system (→ Page 154).
7. Open fuel supply line before fuel filter.
8. Vent fuel system.
MS15009/00E 06-09
Task Description
© MTU

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents