104
8. Install injection pump, observing marked
installation position.
9. Install securing screws of injection pump
and tighten with torque wrench to specified
torque 60 Nm + 12 Nm.
10. Install fuel line (2).
11. Use torque wrench to tighten union nut at injection
pump to specified torque 20 Nm + 5 Nm.
• Maximum permissible tightening torque: 35 Nm
12. Use torque wrench to tighten union nut on pressure
pipe neck to specified torque 20 Nm + 5 Nm.
• Maximum permissible tightening torque: 35 Nm
13. Install injection pump wiring (1).
14. Tighten screws to specified torque
1.0 Nm ± 0.2 Nm using torque wrench.
Final steps
1. Remove barring tool (→ Page 89).
2. Clean mating faces on cylinder head and charge-air pipe.
3. Check gaskets for damage and replace them, if required.
4. Coat gaskets with petroleum jelly and place onto cylinder head.
5. Install charge-air pipes.
6. Install engine control system (→ Page 154).
7. Open fuel supply line before fuel filter.
8. Vent fuel system.
MS15009/00E 06-09
Task Description
© MTU