Appendix 3: Maintenance; A Cleaning; B Maintenance; C Servicing - Alesis AI-2 Reference Manual

Interface device for the alesis adat 8-track digital audio tape recorder
Table of Contents

Advertisement

8.2 APPENDIX 3: MAINTENANCE/

SERVICE INFORMATION

8.2A Cleaning

First, turn the unit off and disconnect the AI-2 wall mounting power
supply. Use a damp cloth, with a mild detergent to clean the front
panel of the AI-2. Under no circumstances use an abrasive cleaner
or chemical solvent, this will damage the front panel finish.

8.2B Maintenance

The AI-2 is a solid state device that will give a life time of service
with no maintenance. To keep the AI-2 looking as good as new,
periodically clean the front panel.

8.2C Servicing

If problems occur, check the cables between the AI-2, controller
and ADAT transports, also refer to the Troubleshooting Guide and
Error Messages listed in Appendix Four.
There are no fuses inside the AI-2, if the unit fails to power up, try
replacing the wall mounting power supply with a similar 9-12 volt
AC supply.
DO NOT ATTEMPT REPAIRS YOURSELF. THERE ARE NO
USER SERVICEABLE PARTS INSIDE THE AI-2. REFER ALL
SERVICING TO TIMELINE.
YOU MUST FIRST CONTACT TIMELINE CUSTOMER SERVICE
TO OBTAIN AN RMA NUMBER (Return Authorization Number)
BEFORE THE UNIT IS RETURNED TO TIMELINE.
UNITS RETURNED TO THE FACTORY WITHOUT RMA
NUMBERS WILL BE SUBJECT TO UNNECESSARY DELAYS.
For International service contact your local Alesis distributor. For
service in the USA, contact:
TimeLine Vista Inc.
2401 Dogwood Way
Vista, CA 92083
3620
Phone: (619) 727 3300 Fax: (619) 727
74

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents