CONFIGURATION OF CASCADED THERMAL UNITS
DEPENDING 1
Functions:
− Reads the secondary circuit sensor (SC)
− Controls thermal unit two-way valve (V1)
− Controls the pump in a DEPENDENT direct zone (P1) with
the zone sensor (S1), with the consent of TA/OT (room
thermostat/Open Therm interface)
Programmable outputs and inputs parameter configuration (*)
(If Par. 97 = 11-21-22-23-24-25 - Stand alone configuration)
Par.
Description
Parameter setting
No.
Progr.ble
8 = LPG gas solenoid
125
outp. 1
valve (VLPG)
Progr.ble
187
16 = Zone pump (P1)
outp. 5
Progr.ble
128
1 = General pump (V1)
outp. 4
3 = System sensor (used
122 Prog Input 7
as secondary circuit
sensor SC)
188 Prog Input 9
2 = Zone sensor (S1)
(*)
Do NOT change the factory setting of parameter 97
Configuration of parameters for INAIL kit (***)
Par.
Description
Parameter setting
No.
2 = Water pressure
123 Prog Input 8
117
Prog Input 2
3 = Heating flowmeter
(***)
An INAIL kit is required for each thermal unit
Hardware configuration
S1 = OFF (not used)
DIPSWITCH = 01000000
Configuration of boiler parameters
Par.
Description
No.
205
Dep. Zone Control
7
CH Hysteresis
135
Mod. Pump Type
136
Mod. pump mode
140
Minimum Flow
Terminals No.
M02
16-17-18
M02
9-10-11
M02
13-14-15
M01
9-10
M01
13-14
Terminals No.
M01
27-28
switch
M01
21-22-23
Parameter setting
1 = Enabled (according to
need)
7°C
2 = Grundfos (choose
according to need)
Fixed 90% (according to
need)
5 l/min
DEPENDING 2-8
Functions:
− Controls thermal unit two-way valve (V1)
Programmable outputs and inputs parameter configuration (*)
(If Par. 97 = 11-21-22-23-24-25 - Stand alone configuration)
Par.
Description
Parameter setting
No.
Progr.ble
8 = LPG gas solenoid
125
outp. 1
Progr.ble
128
1 = General pump (V1)
outp. 4
(*)
Do NOT change the factory setting of parameter 97
Configuration of parameters for INAIL kit (***)
Par.
Description
Parameter setting
No.
2 = Water pressure
123 Prog Input 8
117
Prog Input 2
3 = Heating flowmeter
(***)
An INAIL kit is required for each thermal unit
Hardware configuration
S1 = OFF (not used)
DIPSWITCH = 00100000
Configuration of boiler parameters
Par.
Description
No.
7
CH Hysteresis
140
Minimum Flow
92
Terminals No.
M02
16-17-18
valve (VLPG)
M02
13-14-15
Terminals No.
M01
switch
M01
21-22-23
Parameter setting
7°C
5 l/min
27-28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tau unit 70Tau unit 100Tau unit 115

Table of Contents