Figure 1.20 Floor Openings For The Primequest 480 Main Unit, The Extended I/O Cabinet, And The Extended Power Cabinet - Fujitsu PRIMEQUEST 480 Installation Planning Manual

Hide thumbs Also See for PRIMEQUEST 480:
Table of Contents

Advertisement

Figure 1.20 Floor openings for the PRIMEQUEST 480 main unit, the
C122-H001-02EN
74 (2.9)
590 (23.2)
89 (3.5) 100 (3.9)
689 (27.1)
150 250
200 350
150 350
150 250
89 (3.5)
100 (3.9)
74 2.9)
590 (23.2)
[Legend]
extended I/O cabinet, and the extended power cabinet
1.6 Floor Plan of Openings in Floor and Template
1726 (68.0)
89 (3.5)
600 (23.6)
299 (11.8)
120 350
100 100
200 350
150 350
Front
575.5 (22.7)
307 (12.1)
101.25 (4.0)
: Interface cable hole
: Inlet air area
: Leveling pad
: Caster
74 (2.9)
129 (5.1)
Floorboard with small holes
and open are of 50%
450 450
Floorboard with small holes
and open are of 50%
450 450
78.25 (3.1)
Unit: mm (in.)
1-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 440

Table of Contents