(Connected To Primequest 480 Unit) - Fujitsu PRIMEQUEST 480 Installation Planning Manual

Hide thumbs Also See for PRIMEQUEST 480:
Table of Contents

Advertisement

(5) Extended I/O cabinet (connected to PRIMEQUEST 480 unit)
ACS
#22
ACS
#23
48 (1.9)
44 (1.7)
ACS
#20
ACS
#21
Notes:
1.
2.
Figure 2.8 External interface ports in the extended I/O cabinet
C122-H001-02EN
Front view
(with the door open)
The 2U space at the bottom of the cabinet is required for use as cable
processing space. Keep this space open. Do not mount any PCI_Box in it.
A blank panel is installed where a PCI_Box is not mounted. If a PCI_Box
has not been added here, be sure to keep the blank panel installed to ensure
normal cooling of the other PCI_Boxes.

(connected to PRIMEQUEST 480 unit)

(Blank panel 2U)
(PCI_Box#7)
(PCI_Box#6)
(PCI_Box#5)
(PCI_Box#4)
(PCI_Box#3)
(PCI_Box#2)
(PCI_Box#1)
(PCI_Box#0)
Rear view
(Blank panel 2U)
(with the door open)
2.2 Signal Cable Connections
144 (5.7)
Unit: mm (in.)
2-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 440

Table of Contents