Figure 2.20 Input power system diagram of PCI_Boxes in a dual power feed
Figure 2.21 Input power system diagram of PCI_Boxes in a single power feed
Figure 2.22 Input power system diagram of PCI_Boxes in
Figure 2.23 AC cable connection under a free-access floor
Figure 2.24 Characteristics of circuit breakers in
Figure 2.25 Characteristics of circuit breakers in
Figure 3.1
Figure 3.2
Figure 3.3
Figure 3.4
Figure 3.5
Figure 3.6
Figure 3.7
C122-H001-02EN
(general) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
customers' distribution panels installed outside Japan . . . . . . . . .
Earthquake-proofing construction method
(anchoring on the floor surface) . . . . . . . . . . . . . . . . . . . . . . . . . .
Earthquake-proofing construction method (through-floor anchoring) 3-4
Example of installing a PRIMEQUEST 480/440 system by
using the earthquake-proofing construction method . . . . . . . . . . .
Example of installing a PRIMEQUEST 480 system with
an extended power cabinet by using
the earthquake-proofing construction method . . . . . . . . . . . . . . . .
Example of installing a PRIMEQUEST 480/440 system with
an extended I/O cabinet by using
the earthquake-proofing construction method . . . . . . . . . . . . . . . .
Example of installing a PRIMEQUEST 480 system with
an extended power cabinet and extended I/O cabinet by
using the earthquake-proofing construction method . . . . . . . . . . .
Opening on the free-access floor
when a seismic-isolation leveling foot is used . . . . . . . . . . . . . . . .
Contents
2-29
2-30
2-31
2-35
2-37
2-38
3-3
3-5
3-6
3-7
3-8
3-9
vii