1.6.1
Floor plans for openings in the floor
This section describes the floor plans for openings to accommodate each unit.
Floor openings for the PRIMEQUEST 480/440 main unit (Figure 1.17)
Floor openings for the PRIMEQUEST 480/440 main unit and the extended I/O
cabinet (Figure 1.18)
Floor openings for the PRIMEQUEST 480 main unit and the extended power
cabinet (Figure 1.19)
Floor openings for the PRIMEQUEST 480 main unit, the extended I/O cabinet,
and the extended power cabinet (Figure 1.20)
C122-H001-02EN
1.6 Floor Plan of Openings in Floor and Template
1-23