Table 2.2 Cable List (Lan And Other Device Connection) - Fujitsu PRIMEQUEST 480 Installation Planning Manual

Hide thumbs Also See for PRIMEQUEST 480:
Table of Contents

Advertisement

CHAPTER 2 Connection Reference
(2) Cable list
When determining the total length of the external interface cable to be connected to
the PRIMEQUEST 480/440, allow for an extra length of cable for pulling out the
units.
No.
Name
(1) Multimode Fibre Channel
Cable
(2) Multimode Fibre Channel
Cable
Y:
2-8

Table 2.2 Cable list (LAN and other device connection)

Order code
CBL-MLLB02
CBL-MLLB05
CBL-MLLB15
CBL-MLLC05
CBL-MLLC10
CBL-MLLC20
CBL-MLLC30
CBL-MLLC40
CBL-MLLC50
CBL-MLLAIA
CBL-MLSB02
CBL-MLSB05
CBL-MLSB15
CBL-MLSC05
CBL-MLSC10
CBL-MLSC20
CBL-MLSC30
CBL-MLSC40
CBL-MLSC50
CBL-MLSAIA
Supported
Outside
Japan
Japan
Y
Y
Optional: Select 2, 5, or
15 m.
Y
Y
Dual LC connector - Dual
LC connector cable
Y
Y
Sheathless
Y
Y
Optional: Select 5, 10, 20,
30, 40, or 50 m.
Y
Y
Dual LC connector - Dual
Y
Y
LC connector cable
Y
Y
Sheathed
Y
Y
Y
Y
Optional: 100 m.
Dual LC connector - Dual
Y
Y
SC connector cable
Sheathed
Y
Y
Optional: Select 2, 5, or
Y
Y
15 m.
Dual LC connector - Dual
SC connector cable
Y
Y
Sheathless
Y
Y
Optional: Select 5, 10, 20,
30, 40, or 50 m.
Y
Y
Dual LC connector - SC
Y
Y
connector cable
Y
Y
Sheathed
Y
Y
Y
Y
Optional: 100 m.
Dual LC connector - SC
Y
Y
connector cable
Sheathed
Length
Packaging
[m (ft)]
5 (16)
15 (49)
5 (16)
10 (33)
20 (66)
30 (98)
40 (132)
50 (164)
100 (328)
5 (16)
15 (49)
5 (16)
10 (23)
20 (66)
30 (98)
40 (132)
50 (164)
100 (328)
C122-H001-02EN
2 (7)
2 (7)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 440

Table of Contents