Figure 1.19 Floor Openings For The Primequest 480 Main Unit And - Fujitsu PRIMEQUEST 480 Installation Planning Manual

Hide thumbs Also See for PRIMEQUEST 480:
Table of Contents

Advertisement

CHAPTER 1 Installation Reference
Figure 1.19 Floor openings for the PRIMEQUEST 480 main unit and the
1-26
1080 (42.5)
38 (1.5)
1042 (41.0)
69 (2.7)
600 (23.6)
194 (7.6)
120 350
200 350
150 350
Front
81.25 (3.2)
575.5 (22.7)
[Legend]
: Interface cable hole
: Inlet air area
: Leveling pad
: Caster
extended power cabinet
299 (11.8)
74 (2.9)
129 (5.1)
100 100
Floorboard with small holes
and open are of 50%
450 450
307 (12.1)
78.25 (3.1)
Floorboard with small holes
and open are of 50%
450 450
Unit: mm (in.)
C122-H001-02EN