6-4 Execution PLC
If you understand and ready for above mentioned chapters, here we can start to execute the PLC program.
We should active / re-active the TwinCAT configuration after any configurations changed or your TwinCAT
master in configure mode.
Note: You MUST setup PD link so that TwinCAT master can let the slave enter OP mode.
Please follow below steps for execute PLC application:
Step 1: Confirm the AX58200 in "OP" state
⚫
⚫
Step 2: Click "Login"
Copyright (C) 2019-2020 Reserved by ASIX Electronics Corporation, All Rights Reserved.
GPIO / AIO User Guide
Reference Design User Guide
Figure 6 - 18
Figure 6 - 19
Figure 6 - 20
44
AX58200
Need help?
Do you have a question about the AX58200 and is the answer not in the manual?