Ceiling-Floor Unit Installation - Pioneer CB009GMFILCFHD Service Manual

3d dc inverter heat pump
Table of Contents

Advertisement

12.2.3.2 Install the main body
Fix the hook with tapping screw onto the
wall
Hang the indoor unit on the hook.
(The bottom of body can touch with floor or
suspended, but the body must install vertically.)

14.2.1 Ceiling-floor unit installation

14.2.1.1 Service space for indoor unit
12.2.1.2 Bolt pitch
① Ceiling installation
Capacity
(Btu/h)
24K
36K
48K
② Wall-mounted installation
3.4.1Install the pendant bolt
① Ceiling installation
Select the position of installation hooks according
to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the
selected positions on the ceiling. Then embed the
expansible hooks (fittings).
② Wall-mounted installation
Install the tapping screws onto the wall.(Refer to
picture below)
60
D
E
983
220
1200
220
1565
220

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents