Schulte SMR-800 Operator's Manual page 52

Multi-rake
Table of Contents

Advertisement

Rock Windrower PRE-OPERATION Inspection
Implement ID#_________________________Make___________________________
Date: ________________________________Shift____________________________
Before conducting the inspection, make sure the tractor engine is off, all rotation has
stopped and the tractor is in park with the parking brake engaged. Make sure the
mower is resting on the ground or securely blocked up and all hydraulic pressure
has been relieved.
The Operator's Manual is in the canister on the implement
All safety decals are in place and legible
The hitch connection is secure with lock pins fully engaged
The hydraulic cylinders pins are properly retained
There are no leaking or damaged hoses
The Roller is in good condition
Chain drives are tight
Chain drives are properly lubricated
Tires are properly inflated and in good condition
Wheel lug nuts are tight
Transport locks are in good condition
Operator's Signature: ______________________________________________________
DO NOT OPERATE an UNSAFE SKID STEER or IMPLEMENT
SMR-800 04/19
© 2019 Alamo Group Inc.
OPERATION
Item
Operation Section 4-14
Condition at
Specific Comments if
Start of Shift
not O.K.

Advertisement

Table of Contents
loading

Table of Contents