PRE-DELIVERY CUSTOMER CHECKLIST

Lubricate all grease fittings. Refer to the grease schedule in this manual.
Check that all nuts and bolts are in place and properly tightened. Refer to the Maintenance
Section of this manual for required bolt grades and torques.
Check that all tires are inflated to proper specifications. Refer to the Maintenance Section
of this manual for required tire pressures.
Are the Tires clear of the Mainframe, even when turning during axle articulation?
Are all hoses tight and do not leak?
Are all decals in place? See manual for decal description and placement.
Are all bolts tight?
Have all hoses been properly routed so that hoses do not kink or bind when windrower is articulated
through all motions?
Is machine equipped with proper operator protection?
Is drum rotation correct?
Does implement operate smoothly at normal operating speed? Implement should not vibrate excessively.