Flagro FVO-400RCBT Operating Instructions Manual page 5

Indirect fired space heaters bulk tank
Table of Contents

Advertisement

FV SERIES CONSTRUCTION HEATER – VENTING REQUIREMENTS
1. VERTICAL FLUE TERMINATIONS
D
FLUE OUTLET OF HEATER
2. HORIZONTAL FLUE TERMINATIONS
FLUE OUTLET OF HEATER
THIS HEATER IS CONSIDERED A CATEGORY 3 APPLIANCE
STACK TEMPERATURES CAN BE UP TO 900 DEG F.
A -
VENT TERMINATION MUST BE A MINIMUM OF 2FT HIGHER THAN ANY POINT
WITHIN 10FT.
B -
MAXIMUM HORIZONTAL RUN IS 30FT.
NOTE: 90deg ELBOW = 10ft HORIZONTAL VENT ALLOWANCE
45deg ELBOW = 5ft HORIZONTAL VENT ALLOWANCE
C -
VENT TERMINATION IN HORIZONTAL POSITION MUST BE MINIMUM 4ft FROM ANY
COMBUSTABLE SURFACE
D -
EXTERIOR VERTICAL VENT TERMINATION MUST BE A MINIMUM OF 2ft.
NOTE:
ALL VENT TERMINATIONS MUST HAVE A RAIN CAP INSTALLED AS PER
LOCAL CODE REQUIREMENTS.
B
VERTICAL FLUE RUN
HORIZONTAL FLUE RUN - RISE RATIO 1:10
B
(SPECIAL VENTING SYSTEM)
- 5 -
A
C
EXTERIOR WALL

Advertisement

Table of Contents
loading

Table of Contents