Oshpd Seismic Anchoring/Mounting - Daikin Skyline OAH003GDAC Installation And Maintenance Manual

Outdoor air handler
Table of Contents

Advertisement

OSHPD Seismic Anchoring/Mounting

For seismic stability of the unit, additional anchoring and
mounting procedures are required. The anchoring options and
corresponding spectral response acceleration are given in
Table
6. Holes in the Vision/Skyline base frame are to be field
drilled. Any mounting hardware is to be field supplied.
Table 6: OSHPD Mounting
Attachment Method
SDS
Bolted attachment to
1.93
steel
(Figure
52)
Welded attachment
1.84
to steel
(Figure
53)
Bolted attachment to
1.68
Concrete
(Figure
54)
Figure 53: Unit with Base Frame Mounted on Steel
www.DaikinApplied.com
Attachment System (by Others)
Spacing
System
48
5/8" DIA SAE Grade 5
3/16" Weld Leg and
48
4" welded length
Hilti HDA-P M16 x 190/40 with
24
7.48" embedment
Figure 54: Unit with Base Frame Welded
Figure 55: Unit with Base Frame Mounted on Concrete
27
IM 777-18 • SKYLINE OUTDOOR AIR HANDLER
M
I
eChanICal
nsTallaTIon

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents