Daikin Skyline OAH003GDAC Installation And Maintenance Manual page 56

Outdoor air handler
Table of Contents

Advertisement

Figure 86: Rack Furnace Wiring Diagram
VCB Panel
Terminals
GRN/YEL
GND
L2
WHT
L1
BLK
Slave 3
N
Htr.
Legend:
-
Distribution Panel Terminal Connection
N
VCB Control Panel terminal
IM 777-18 • SKYLINE OUTDOOR AIR HANDLER
RED
+
-
BLK
BLU
T1
T2
BLU
Customer Safety Interlocks*
GD
Slave 1
N
L1
Htr.
Slave 2
N
L1
Htr.
L1
Factory Wiring
Customer Wiring
Fuse
10 VDC Analog Input from
Building Management System
System Heat Enable Contact
WHT
L2
WHT
L2
WHT
L2
WHT
L2
BLK
Mod.
N
L1
L1
Htr.
BLK
12A
BLK
L1
12A
BLK
L1
12A
BLK
L1
12A
56
* Customer safety
interlocks include
Air flow proving switch,
auxiliary manual reset
limit and gas pressure
switch (if required)
WHT
WHT
WHT
115V Line
WHT
L2
Voltage Supply
L1
BLK
1
BLK
BLK
WC-HDR-HXT-FDP-12A-VCB-1M-3SL
BLK
For use with modular heater assemblies
Models HXT100-125
www.DaikinApplied.com
G
f
as
urnaCe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents