7 Operation

Information about
• Network connection (power is supplied via the connecting cable of the
display unit)
• Initial Commissioning
• Connection of peripheral devices
• Adjustment, linearization and verification (only the complete balance is
verifiable, i.e. weighing bridge in conjunction with a suitable display unit)
and the correct operation you will in the operating instructions included in the scope
of delivery of the display unit.

7.1 Operation with access ramps

• The load plate of the weighing bridge is an active weighing element, the access
ramps are passive, i.e. during the weighing process all wheels of the conveying
vehicles must rest on the load plate.
• The air gap between the load plate and the access ramps must be free. Especially
for weighing of grainy or small-piece weighing goods, the gap should be controlled
regularly and kept clear.

7.2 Load/unload weighing bridge

• Place the load on the scales using a lifting truck, a crane or a forklift truck. Ensure
that the load is not swinging when it is placed onto the scales.
• Lift the load first vertically at least 10 cm above the scales before it is removed or
newly placed.
KKP_V40-IA-e-1710
By this way a continuous optimal performance is guaranteed:
• Avoid falling load, shock loads and impacts from the side!
• For weighing operation, all objects must be placed
centrically of the weighing bridge and may not hang over
the edges or the ramps.
• Check adjustment at regular intervals.