Toro 34230 Operator's Manual page 31

Stand-on e-spreader/sprayer
Table of Contents

Advertisement

Figure 35
1. Locking sleeve
2. Gate cable
3. Ball stud
2.
Pull the cable off the ball stud
3.
Rotate the drop-rate cam past position-9 so
that the slot in the cam aligns with the linkage
(Figure
35).
4.
Fully push the rate-gate linkage rearward
35).
5.
If there is material in the hopper allow the
material to pour into a shallow pan; when the
hopper is empty, remove the pan.
g027304
4. Drop-rate cam
5. Rate-gate linkage
(Figure
35).
(Figure
Connecting the Rate-Gate Linkage
1.
Pull the linkage out until it clears the drop-rate
cam
(Figure
35).
2.
Move the heavy distribution granular-gate lever
forward.
3.
Attaching the cable to the ball stud at the gate
lever(Figure
35).
Assembling the Impeller
1.
Assemble impeller onto the impeller shaft and
secure the impeller with the drive pin.
2.
Align the holes in the front cover with the clip
nuts in the chassis and secure the cover with
the 4 thumbscrews that you removed in step
of
Removing the Impeller (page
31
3
30).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents