RGBlink Flexpro 8 User Manual page 6

Hide thumbs Also See for Flexpro 8:
Table of Contents

Advertisement

Unpacking and Inspection
Before opening Felxpro 8 processor shipping box, inspect it for damage. If you find any
damage, notify the shipping carrier immediately for all claims adjustments. As you open the box,
compare its contents against the packing slip. If you find any shortages, contact your sales
representative.
Once you have removed all the components from their packaging and checked that all the listed
components are present, visually inspect the system to ensure there was no damage during
shipping. If there is damage, notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your Felxpro 8 should be clean, properly lit, free from
static, and have adequate power, ventilation, and space for all components.
Felxpro 8
User Manual
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

710-1008-01-0

Table of Contents