PAT EI 65 Operator's Manual page 15

Angle-length-radius-load indicator system, lattice boom cranes
Hide thumbs Also See for EI 65:
Table of Contents

Advertisement

OPERATOR'S SECTION
If there is a difference between the indicated and the actual condition, the operator must
correction those values by completing step 1 to 14 in Section 4.2.2.
The system stores the preset values for minimal 2 hours when the crane voltage is switched
off. After a loss of the preset values the operator will need to reset these values.
MB 115.0 J1 85.0
J2
50.0 0J 15.0 1
configuration. To confirm the displayed values push the button "OK" (10).
To change the configuration values go to one of the following sections. If the system
configurations are correct, go to Section 5 PRE-OPERATION INSPECTION.
Section 4.2 will allow the operator to change all crane configurations.
Section 4.2.1 will allow the operator to quickly change Reeving only
Section 4.2.2 will allow the operator to quickly to change Hoist selection only.
Setting Operating Configuration of the Crane
STEP 1
To enter new values the button "Select" (6) has to be pushed.
The DOWN (11) button can be pressed to skip a step in the following procedure. When the a
particular step is skipped, the configured values of that step remain the same as the
confirmed values in Section 4.1
STEP 2
SELECT BOOM?
PUSH ↓ OR OK
Push Button "OK" (10) for next step.
To continue with the previously entered boom configuration the button DOWN (11) has to be
pushed.
Step 3 to 9 will be skipped, when the button "DOWN" is pressed.
STEP 3
MAIN BOOM?
PUSH ↓ OR OK
If the crane is equipped only with a main boom (without jib or boom extension) the button OK
(10) has to be pressed.
Step 5 to 9 will be skipped, when the button "OK" is pressed.
The display shows the previously programmed boom and jib
configuration. The crane operator can compare the preset
Operating
Configuration
The operator is requested to enter the boom configuration. To enter
new boom data he has to push the button "OK" (10).
The operator is requested to push the button "DOWN" (11) if the
crane is equipped with a boom extension.
L-B B5L0082/PAT 031-300-190-015 REVISION D 04/15/99
Values
with
the
9
actual
crane

Advertisement

Table of Contents
loading

Table of Contents