Installation; Installation Instructions - Pepperl+Fuchs LGC2 Manual

Hydrostatic level measurement 4 to 20 ma analog
Hide thumbs Also See for LGC2:
Table of Contents

Advertisement

Level Probe LGC2

Installation

5
Installation
5.1

Installation Instructions

Figure 5.1
1
Cable mounting screw can be ordered as an accessory
2
Terminal box can be ordered as an accessory
3
Bending radius of extension cable > 120 mm (4.72 inch)
4
Mounting clamp can be ordered as an accessory
5
Probe connection (extension cable), cable length
6
Guide tube
7
Level probe LGC
8
Additional weight can ordered be an accessory for the level probe with external diameter
of 22 mm (0.87 inch) and 29 mm (1.14 inch)
9
Protection cap
20
1
2
OPEN
90°
CLOSE
90°
3
4
5
6
7
8
9

Advertisement

Table of Contents
loading

Table of Contents