Installation; Mounting - Pepperl+Fuchs LGM Series Brief Instructions

Measuring automation light grid
Hide thumbs Also See for LGM Series:
Table of Contents

Advertisement

LGM Series

Installation

3
Installation
3.1

Mounting

Make sure the detection field is free from obstacles. The first and last beams
within the detection field are used for optical synchronization of emitter and
receiver units. If both beams are blocked, synchronization is lost and the mea-
surement is inhibited. The system is preconfigured for operation wth cable outlet
upwards. For installation with cable outlet downwards, the receiver unit can be
configured via IO-Link for the zero-point reference on the cable side.
Emitter unit
Receiver unit
Figure 3.1
To mount the slim panels, use customized bore holes (d = 4.5 mm for M4 screws)
or a rear, continuous groove (for flat M6 nuts in accordance with ISO 4035).
Various brackets are available for mounting the light grid .
Mounting Using the Rear Groove
There is a continuous groove located on the rear of the strip on the light grid. Stan-
dard flat M6 nuts (in accordance with DIN 4035) fit into this groove. You can mount
the light grid using these inserted nuts.
Mounting Using Customized Bore Holes
You can mount the light grid using user-defined holes. The maximum screw size is
M4. Make sure to follow the instructions when positioning the hole. Improper han-
dling can damage internal electronics.
10
5
21.2
Detection field
20
Light Grid Dimension Drawing
Detection field + 159
137.8

Advertisement

Table of Contents
loading

Table of Contents