Sliding Sleeves; Post-Installation Check - Pepperl+Fuchs LVL-M3 Brief Instructions

Vibration limit switch
Hide thumbs Also See for LVL-M3:
Table of Contents

Advertisement

Vibration Limit Switch LVL-M3
Mounting
Aligning the Cable Entry
Note
The locking screw is not tightened when the device is delivered.
Aligning the Cable Entry
1.
Loosen the external locking screw (maximum 1.5 turns).
2.
Turn the housing, align the cable entry.
Avoid moisture in the housing, provide a loop to allow moisture to drain off.
3.
Tighten the external locking screw.
1.
Figure 4.12
4.3

Sliding Sleeves

For more information see manual.
4.4

Post-Installation Check

Is the device undamaged (visual inspection)?
Does the device conform to the measuring point specifications?
For example:
Process temperature
Process pressure
Ambient temperature
Measuring range
Are the measuring point number and labeling correct (visual inspection)?
Is the device adequately protected against precipitation and direct sunlight?
Is the device properly secured?
18
2.
Housing with external locking screw
3.
4 3.5 Nm

Advertisement

Table of Contents
loading

Table of Contents