3.4 Installation of OptiStar EdgeSwitch Modules
3.4.1 Slot Numbering
Review the diagram below indicating the OptiStar EdgeSwitch slots and the location of the 10/100 port and the
Console port. Determine which modules will go into each slot. Tip: Install the Modules in the bottom slots
first.
Primary Power Module
Slot 1
PORT 1
Slot 3
PORT 1
Host Controller Module
Figure 3-3: Slot Numbering Diagram
3.4.2 Installing the Network Modules
Before installing any of the Network Modules, place an antistatic strap on your wrist and ground it to any
unpainted metal on the OptiStar EdgeSwitch. You will find grounded, unpainted metal revealed by loosening
any thumbscrew post on a module that is fully inserted into the OptiStar EdgeSwitch chassis. It is recommended
to select a thumbscrew post on the Fan Module or a Power Module.
Figure 3-4: Wrist Strap Grounded to Thumbscrew Post
3 - 6
Secondary Power Module
PORT 2
PORT 1
PORT 2
PORT 1
Console Port
Lucent Technologies
Slot 2
PORT 2
Slot 4
PORT 2
Management Port
365-575-925R1.5
Issue 1, April 2002